Hawk Eye

BPHS planning upgrade to HVAC system

Commercial+Hvac+Commercial+Air+Conditioning
Back to Article
Back to Article

BPHS planning upgrade to HVAC system

Commercial Hvac Commercial Air Conditioning

Commercial Hvac Commercial Air Conditioning

https://www.maxpixel.net/

Commercial Hvac Commercial Air Conditioning

https://www.maxpixel.net/

https://www.maxpixel.net/

Commercial Hvac Commercial Air Conditioning

Logan Wright, Staff Writer

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






Have you ever thought what the school could buy for $1.9 million dollars? Well, now you do… BPHS will be upgrading HVAC system in the summer of 2019 and be finished with the job Aug 10.

On Jan. 15, the school board had learned the estimated cost of the upgrades to HVAC, and they will have a final decision on their next meeting on Jan. 22 to see if they want to sign the contract with Trane, Inc. The new system will upgrade the heating, ventilation and air conditioning and it will be double the cooling power of the recent HVAC system.

The original price of the system was $1.6 million, but one of the maintenance supervisors of the districts suggested an alternative upgrade to build in variable frequency drives to the system. This is where the $1.9 million comes in because to add the new upgrade will cost an additional $300,000, but it will be energy saving, considering the variable drives are presumed to make the system more capable as well as more dependable.

When the brand new high school was finally open, they started out with an undersized HVAC system from the beginning of the year. The situation is when it’s 90-degree weather, which is usually the temperature during the first couple weeks of the new school year, the current system isn’t capable of cooling the whole building adequately on the hot days.

Print Friendly, PDF & Email
About the Writer
Logan Wright, Staff Writer

The gym is loud. The crowd is cheering. The stands are filled with hundreds of fans. On Tuesdays and Fridays in the high school gym is where you will find...

Leave a Comment

If you want a picture to show with your comment, go get a gravatar.




Time limit is exhausted. Please reload CAPTCHA.

Navigate Left
  • BPHS planning upgrade to HVAC system

    Inside the nest

    Ford calls for culture change at BPHS

  • BPHS planning upgrade to HVAC system

    Inside the nest

    BPHS begins Wish Week

  • BPHS planning upgrade to HVAC system

    Inside the nest

    Send your valentine a cookie!

  • Inside the nest

    BPSD closes three days due to weather

  • BPHS planning upgrade to HVAC system

    Hawks Sports

    Girls basketball tournament to raise money for Joey Fabus

  • BPHS planning upgrade to HVAC system

    Inside the nest

    The girls basketball locker room is stinkin’ of sewer

  • BPHS planning upgrade to HVAC system

    Inside the nest

    CIM class designs their own speakers

  • BPHS planning upgrade to HVAC system

    Inside the nest

    Students sprout art

  • BPHS planning upgrade to HVAC system

    Inside the nest

    Students perform winter concert for packed auditorium

  • BPHS planning upgrade to HVAC system

    Inside the nest

    Students spread cheer in biggest Brass Day ever

Navigate Right
The student news of Bethel Park High School.
BPHS planning upgrade to HVAC system